Planning permission: the complete guide

Renov' Guide

Updated on:

Planning permission: all the procedures, deadlines, prices, authorisations and obligations

In a nutshell:

  • The rules may vary depending on the commune and the Local Urban Planning Scheme (PLU). It is therefore strongly recommended that you contact your local town hall to find out about local conditions.
  • Planning permission is required for most construction and renovation projects. in France (this concerns everything to do with the appearance and structure of a building).
  • Applications for planning permission must be submitted to the planning department of your local town hall. and must include numerous detailed documents.
  • An architect is required for many types of workThis applies in particular to work that alters the structure or volume of the building. However, some minor works can be carried out without an architect.

Worth noting : Some energy renovation work can benefit from simplified procedures or be exempt from planning permission, but this depends on the exact nature of the work and the planning regulations in force in your local authority.

In France, property development projects, whether new builds, renovations or conversions, are governed by precise regulations. The central element of this approach is planning permissionThis is an essential official document issued by the local authorities.

This permit, granted by the mayor of your municipalitycertifies that your project complies with current planning regulations, environmental standards and safety requirements.

When do I need planning permission?

Before embarking on your property project, it is essential to determine whether planning permission is required.

Planning permission is generally required for :

  • The construction of new buildingsThis applies to residential, commercial and industrial buildings.
  • Extensions or major alterations to existing buildingsThese include adding an extension or changing the external appearance.
  • Changing the use of a buildingFor example, the conversion of business premises into residential accommodation.
  • Extensive landscapingsuch as in-ground pools, swimming pools, etc. extensions or garden sheds exceeding a certain surface area.
  • Total or partial demolition existing buildings, in certain cases.

It is important to know that certain smaller-scale worksThese include interior renovations that do not affect the structure or external appearance of the building, can be covered by a simple prior declaration of works, or even be exempt from all formalities.

However, we strongly recommend that you contact the town planning department of your local council to avoid any confusion and to ensure that your project complies with local planning regulations.

The procedure for obtaining planning permission in France

Stage 1: Preparing your application

Applications for planning permission must be submitted to the planning department of the town hall where your project is located. The application must contain precise information about the applicant, the land concerned and the specific details of the work planned.

A complete file is essential to avoid delays or rejection.

The elements required include :

  • A detailed description of the project,
  • A site plan,
  • A master plan of the buildings,
  • Plans and sections of the project,
  • Photographs of the current state of the site and its surroundings,
  • The form Cerfa no. 13406*06 duly completed (available on the official French government website or from your local council).

The services of an architect are compulsory for projects exceeding 150 m² floor area. or if the applicant is a legal entity.

The architect will ensure that the project complies with local planning regulations and can represent the applicant throughout the procedure.

Many construction and renovation companies offer a turnkey service that includes managing the application for planning permission.

Exemption: no architect required for certain works

In some cases, for minor works or for buildings with a small surface area, the use of an architect is not compulsory. The conditions for this exemption are set out in the Town Planning Code.

We recommend that you contact the town planning department of your local council to find out the applicable thresholds.

Once the application is complete, it must be handed in at the town hall or sent by registered letter with acknowledgement of receipt. This can be done by the applicant themselves, their architect or an authorised representative.

Stage 2: processing the application and the importance of the Local Planning Scheme (PLU)

Once the application has been received, the town hall's planning department carries out the assessment. This phase involves check that the project complies with the Local Town Planning Scheme (PLU). This urban planning document defines the areas that can be built on, the maximum permitted heights, the rules for siting in relation to boundary lines, and other urban planning requirements.

The PLU plays a crucial role in the decision to grant or refuse planning permission. It is therefore essential that project owners familiarise themselves with the provisions applicable to their plot of land and consult a professional (architect or town planner) beforehand to find out about the possibilities and constraints.

The PLU and any risk prevention plans (PPR) are public documents.These can generally be consulted online on the Town Hall website or at Géoportail de l'urbanisme.

Good to know : In certain cases, the project may be subject to the opinion of the Architecte des Bâtiments de France (ABF) if it is located within a protected area.

What are your responsibilities once planning permission has been granted?

Display obligations

Obtaining planning permission marks the start of a crucial phase in terms of transparency and compliance.

  • A notice indicating the particulars of the planning permission must be posted on the site where the work is to be carried out, so as to be visible from the public highway.
  • This display must be maintained throughout the construction period and for two months after completion of the work. It must inform the public of the details of the project and the possibility of consulting the complete file at the town hall. This practice ensures transparency and enables third parties to find out about projects underway in their vicinity, while at the same time opening up the appeal period for third parties.
  • The beneficiary of the permit must scrupulously comply with the plans and specifications approved in the building permit.. Any substantial change to the project requires the submission of an amending permit, which may entail a new appraisal procedure.

We therefore recommend plan the project properly and avoid last-minute changes which could lead to delays and additional costs.

At the end of the project

When the work is complete, it is time to the declaration of completion and conformity of work (DAACT).

This document must be sent to the town hall, which then hasa deadline for carrying out a compliance check. This is essential if you are to obtain a certificate of non-opposition to the works and, in some cases, to be able to occupy the building.

In addition, it is essential to comply with any specific requirements imposed by the permit, such as environmental measures, rainwater management or energy performance requirements.

Failure to comply with these conditions may result in administrative penalties, fines and even the obligation to bring non-compliant buildings into line or demolish them.

Conclusion: a supervised and responsible career path

Obtaining planning permission is just the beginning of a journey governed by regulations designed to guarantee the quality and safety of buildingswhile preserving the aesthetic and functional harmony of the living environment.

How much does planning permission cost?

The cost of planning permission in France can vary considerably depending on the nature and scale of the project, and the commune in which it is located.

The costs involved in obtaining planning permission are generally structured according to the scale and type of work envisaged.

Here is an overview of typical costs in France (It is important to note that these amounts may vary from one local authority to another:

  1. Applying for planning permission is free of charge in every French commune.
  2. Development tax is the main cost associated with planning permission. It is calculated on the basis of the floor area created and the flat-rate value per m² set each year (€759 in 2022 in Île-de-France, €820 in 2023). The rate of this tax varies from one municipality to another, generally between 1% and 5%.
  3. Preventive archaeology fees applies to all work affecting the subsoil. It is levied at a rate of 0.40% on the same basis as the taxe d'aménagement.

In addition to these taxes directly linked to planning permission, there are other costs to consider:

  • Network connection costs (water, electricity, sewerage) can vary considerably depending on the location of the plot.
  • Contribution to the financing of collective sanitation (PFAC) may be required when connecting to the public wastewater collection network.
  • Architect's fees if its intervention is required (compulsory for projects of more than 150 m² floor area).
  • Any costs incurred in obtaining additional documents required for your application (soil survey, thermal study, etc.).

It is crucial to stress that these amounts can vary from one local authority to another.

We therefore strongly recommend that you contact your local planning department directly to obtain a precise estimate for your specific project.

In conclusion, although applying for planning permission is free of charge, It's important to have an overview of all the costs associated with your construction or renovation project to establish a realistic budget. These costs can represent a significant proportion of the total cost of your project.

The differences between planning permission and a prior declaration

Planning permission and prior declaration are two separate planning authorisations in France, each tailored to specific works.

  • Planning permission is required for new buildings of more than 20 m², for extensions important (over 40 m² in a PLU urban zone, or over 20 m² elsewhere), and changes of use involving structural alterations.
    • It requires a more complete file, often involving an architect.
    • It takes between 2 and 3 months to process.
  • A prior declaration is required for smaller-scale works: alterations to external appearance with no change in volume, small extensions, or changes of use with no structural change.
    • Its backrest is lighter
    • It generally takes one month to process.

Both licences are valid for 3 years, renewable twice for one year.

They must be posted on the site and may be appealed by third parties within two months of posting. Planning permission requires a more systematic check on compliance at the end of the works.

In certain protected areas, a prior declaration can be "upgraded" to planning permission.

Planning permission refused: what can you do?

A refusal of planning permission can be discouraging, but it does not mean the end of your project.

Here's how to deal with the situation effectively:

  1. Decipher the reasons for the refusal: Read the refusal order carefully. It details the reasons why your project has not been approved. The reasons may be varied: non-compliance with the Local Planning Scheme (Plan Local d'Urbanisme or PLU), visual impact deemed to be too great, safety issues or environmental damage.
  2. Ask the experts : Don't hesitate to seek professional advice. Your architect (if you have one) can help you interpret technical objections. Don't hesitate to make an appointment with the town planning department of your local council to find out more about the reasons for refusal.
  3. Rethink your project: In the light of the information gathered, it's time to review your project. This may involve substantial changes such as reducing the living space, altering the layout of the building, or making aesthetic adjustments to blend in better with the local landscape.
  4. Depending on the extent of the changes to be made, you have two options:
    • For minor changes, an amending permit may be enough.
    • If the modifications are significant, it will be necessary to submit a new planning permission application.
  5. Prepare a solid dossier Whatever your choice, make sure that your new dossier responds point by point to the objections raised. Include detailed explanations and, if possible, visuals to illustrate the changes you have made.
  6. Consider recourse as a last option
  7. If, despite your best efforts, your project is still refused, you can consider appealing. Start by lodging an informal appeal with the mayor within two months of being notified of the refusal. If this fails, you can then turn to the administrative court.

If, despite your best efforts, your project is still refused, you can consider an administrative appeal. Start by lodging an informal appeal with the mayor within two months of being notified of the refusal. If this fails, you can then turn to the administrative court.

Bear in mind that patience and perseverance are often rewarded in this process. Constructive dialogue with the local authorities can go a long way to helping your project come to fruition. Don't forget that each commune has its own specific urban planning requirements, reflected in its PLU.

Do I need planning permission to renovate my home?

The need for planning permission for renovation work depends on the scale and nature of the changes envisaged.

A permit for extensions

  • Permits are generally required for major extensions.Such as an extension creating more than 40 m² of floor space or floor area (20 m² in certain cases).
  • It is also necessary when major changes are made to load-bearing structuresIn the event of a change of use, significant alterations to the volume of the building, or changes of use accompanied by structural work.
  • Work on buildings listed as historic monuments or located in protected areas systematically requires a permit.

For many renovation projects: all you need is a prior declaration

  • This is the case for modifications to the external appearance (such as changing windows or roofs), internal alterations that do not change the use of the building, and small extensions of between 5 and 20 m² (or 40 m² in certain urban areas).
  • Most energy renovation workas external insulationThese can generally be carried out with a prior declaration, unless they significantly alter the external appearance of the building.

It's vital to consult the town planning department at your local council before undertaking any work, as the rules can vary depending on the commune and the zone covered by the Local Planning Scheme (PLU).

List of works that do and do not require planning permission

  • Construction new buildings, whether for residential, commercial or industrial use.
  • Extensions or major extensions creating more than 40 m² of floor space or floor area (20 m² in urban areas of a PLU if the total surface area exceeds 150 m² after work).
  • Change of use a building with changes to the load-bearing structures or facade (e.g. conversion of commercial premises into residential accommodation).
  • Changes in volume of an existing building and the creation or extension of an opening on an external wall.
  • Work on a listed building or located in a protected area.
  • Construction of swimming pools with a pool area of 100 m² or more.
  • Extensions between 5 and 40 m² of floor area (or between 5 and 20 m² in urban areas covered by a PLU).
  • Modifications to external appearance an existing building (facade renovation, change of roof).
  • Installation of solar panels on the roof of a building.
  • Construction of fences in certain municipalities.
  • Changes of use without modifying the load-bearing structures or the façade.
  • Interior fittings do not affect the load-bearing structures or alter the external appearance of the building.
  • Small buildings with a floor area of less than 5 m² and a height of less than 12 m.
  • Inflatable or demountable pools with a pool area of less than 10 m².
  • Level terraces.
  • Minor ordinary maintenance or repairs.

It is important to note that these rules may vary depending on the commune and the zone covered by the Local Urban Planning Scheme (PLU). Some communes may have stricter rules, particularly in protected areas or safeguarded sectors. It is always advisable to check with the town planning department of your local council before undertaking any work.

FAQ : Everything you need to know about planning permission in France

In France, planning permission is required for certain building or renovation works. It is required for :

  • Any new building with a floor area of more than 20 m². or floor area
  • Major extensions (more than 40 m² in an urban area covered by a PLU, or more than 20 m² elsewhere)
  • Changes of use of a building with modifications to the load-bearing structures or façade
  • Substantial alterations to the volume of an existing building

To obtain planning permission, follow these steps:

  1. Put together a complete file (Cerfa form, plans, descriptive note, etc.)
  2. Submit your application to the town planning department at your local town hall
  3. Wait for your application to be processed (2 to 3 months depending on the case)
  4. Display the permit on your property as soon as it is obtained
  5. Start work within 3 years after obtaining the licence

The main difference lies in the scale of the work involved:

  • Planning permission is required for major works (new buildings, major extensions).
  • Prior declaration is sufficient for minor works (small extensions, changes to external appearance)

Planning permission requires a more comprehensive application and takes longer to process and issue (2 to 3 months) than a prior declaration (generally 1 month).

Some renovation work can be carried out without planning permission, in particular :

  • Interior renovations not affecting load-bearing structures (renovation of a kitchen, bathroom, floors and walls, etc.)
  • Small extensions of less than 20 m² (or 40 m² in the urban zone of a PLU if the total surface area is less than 150 m²)
  • Alterations to the external appearance without any change in volume. However, such work may require a prior declaration.

It is always advisable to check with the town planning department of your local council before undertaking any work.

If your planning permission is refused, follow these steps:

  1. Carefully analyse the reasons for refusal indicated in the order
  2. Contact the town planning department your town hall for clarification
  3. Modify your project according to the objections raised
  4. Submit a new planning permission application or an amending permit
  5. If the refusal persists and you consider it unjustified, you can make an informal appeal to the mayor, then possibly refer the matter to the administrative court

A few suggestions to take you further...